PKX 2EV Typical installations

1. Tunnel dishwasher with two solenoid valves

PKX 2EV typical installation 1
Legend

A – Main
B – Detergent pump (PKX 2EV)
C – Brightner pump (PKX MA/A)
D – Deteregent tank
E – Brightner tank
F – Filter
G – Injection valve
H – Pump
L – Loading tube
M – Drum
N – Loading valve
O – Rinsing valve
P – Boiler
Q – Washing
R – Rinse




2. Single tank dishwasher with two solenoid valves



Legend

A – Mains
B – Detergent pump (PKX 2EV)
C – Brightner pump (PKX MA/A)
D – Deteregent tank
E – Brightner tank
F – Filter
G – Injection valve
H – Pump
L – Loading tube
M – Drum
N – Loading valve
O – Rinsing valve
P – Boiler
PKX 2EV typical installation 2